It was another really full day today. Nick Frei is a machine and we made some great progress. 

DAY FIVE BEFORE - LAUNDRY ROOM
(On the left side of the pic you can see a long PVC pipe. The previous owners didn't punch out the pre-cut hole for the washer drain to go next to the washer water hook-up. So they plumbed a new drain with the GIANT PVC pipe to put the drain into. We punched out the hole and got rid of the PVC. )

I removed the upper cabinet on the right side and the shelving unit, painted the ceiling and one accent wall in the laundry room. I still need to paint the other three walls white.

The first layer of wall texture was finished in the great room, dining room, kitchen, and pantry.

We got started on the texture in the master bedroom.
 


The electrician and cable installers came today. We got all the wires where they should be now and not draped across the floor. We also had to move a lot of the electrical in the master and both baths to accommodate all the doorway movement. 

Nick started patching the seam where we removed the wall in the living room. You can also see how we had the cable and and electrical wired to the middle of the wall so as to be able to make it easier to hang the TV without the cable hanging down. 

 We got the sheet rock hung on the new wall in the craft room and play room and the new master bedrooms/bathroom doorways. 


And lastly, Jenna was a great help cutting in her bedroom and painting the molding in her bedroom. 